- What we did
- Natural gas
- Plumbing
- Features
- Condominium units
19 floors
311 units - Years
- 2021
- Location
- Brossard, Qc
About the project
Jenaco's was awarded the plumbing and natural gas contract for the second phase of the Oria project, led by the general contractor Edyfic Construction.
- What we did
- Natural gas
- Plumbing
- Features
- Condominium units
19 floors
311 units - Years
- 2021
- Location
- Brossard, Qc
“We are very happy to continue our collaboration on this innovative large-scale project where we can put our expertise in building mechanics to use,” said founder, and president Jean Turgeon. In fact, a team from Jenaco is already at work on the 158 Condominium of Phase 1. The Phase 2 of Oria project has 311 units spread over 19 floors.
This is the third time that the piping specialists will be working with Edyfic Construction, the general contractor, and Devimco, the developer. In addition to the Oria I project, a team from Jenaco is working on the plumbing and natural gas contract for the 14-storey Eolia building in the same ecological real estate mega-complex Solar Uniquartier in Brossard. Note that the latter is characterized by its TOD (Transit-Oriented-Development) approach. It is counting on the fact that it will be easy to reach of the city with the REM station that are operational since 2022 (light rail transit—LRT).
The Oria II project has upscale studios and condos with 1 to 3 bedrooms, and penthouses with elevated ceilings. There will also be a 1,100 square foot co-working space and several other amenities including an outdoor terrace equipped with a kitchen.
Work on this second phase was started in the fall of 2021 and ended in fall 2023. Up to 18 pipefitters were assigned to this plumbing and natural gas contract during peak periods.
Certifications
LEED v4 OR