When faced with the unexpected, some interventions require precision, coordination, and speed of execution. This is the context in which an international transportation and logistics brokerage company, located in the West Island of Montréal, contacted Jenaco for a two-step technical mandate.
The Jenaco team started by temporarily relocating the large-scale industrial refrigeration equipment. Using a 140-ton crane, the units were carefully removed to allow another team to fully decontaminate the floor in that part of the building.
During this phase, Jenaco also cut the existing piping, in preparation for a subsequent return to service.
“We had to take into account both the requirements of this maintenance operation and the reinstallation of the still functional equipment in the same location.”
A few weeks later, the coolers were reinstalled in just four days. The connections were meticulously carried out—in compliance with standards and on schedule.
This intervention demonstrates the expertise and agility of the Jenaco service team in the field, showing it to be capable of delivering effective solutions, even in complex situations. This is another concrete example of a job done in full compliance with established standards, resulting in client satisfaction.